Monday, March 1, 2010

Day 49 (Mar 1): Milton to DeFuniak Springs 68





Odo 5248.1

This was a warm, pretty day, and I found an open bike shop in Milton where I could get a tire. The bike shop had an exact replacement for my tire. Then I started down the Black Water Trail, a converted railroad track. I've been dismissive of railroad track conversions in the past, but I have to say that riding on this one was a good experience. The gradients are all very nice, almost imperceptible.

I had a pleasant day riding through Blackwater River State Forest on very small roads with almost no traffic. I finished riding on 90, which didn't have too much traffic.

No comments:

Post a Comment